HomeHome
 
  • Start page
  • Statistics centre
  • Legal texts

    Legal texts

    Legal texts from the European Patent Office (EPO) in a format optimised for different screen sizes.

    Go to overview 

    • Overview
    • European Patent Convention
      • Overview
      • Archive
    • Official Journal
    • EPC Guidelines
      • Overview
      • Archive
    • PCT-EPO Guidelines
      • Overview
      • Archive
    • Guidelines revision cycle
    • Extension / validation system
    • London Agreement
    • National law relating to the EPC
      • Overview
      • Archive
    • National measures relating to the Unitary Patent 

    Hand touching a tablet

    EPC now at your fingertips, on all devices

  • News & events

    News & events

    Our latest news, podcasts and events, including the European Inventor Award.

    Go to overview 

     

    • Overview
    • European Inventor Award
      • Overview
      • About the award
      • Categories and prizes
      • Meet the finalists
      • Nominations
      • Watch the 2022 ceremony
    • Press centre
      • Overview
      • Patent Index and statistics
      • Search in press centre
      • Background information
      • Copyright
      • Press contacts
      • Call back form
      • Email alert service

    EIA jury

    Meet the European Inventor Award jury

 
en de fr
  • Language selection
  • English
  • Deutsch
  • Français
Main navigation
  • Start page
  • Statistics centre
  • Legal texts
    • Go back
    • Overview
    • European Patent Convention
      • Go back
      • Overview
      • Archive
        • Go back
        • Overview
        • Documentation on the EPC revision 2000
          • Go back
          • Overview
          • Diplomatic Conference for the revision of the EPC
          • Travaux préparatoires
          • New text
          • Transitional provisions
          • Implementing regulations to the EPC 2000
          • Rules relating to Fees
          • Ratifications and accessions
        • Travaux Préparatoires EPC 1973
    • Official Journal
    • EPC Guidelines
      • Go back
      • Overview
      • Archive
    • PCT-EPO Guidelines
      • Go back
      • Overview
      • Archive
    • Guidelines revision cycle
    • Extension / validation system
    • London Agreement
    • National law relating to the EPC
      • Go back
      • Overview
      • Archive
    • National measures relating to the Unitary Patent 
  • News & events
    • Go back
    • Overview
    • European Inventor Award
      • Go back
      • Overview
      • About the award
      • Categories and prizes
      • Meet the finalists
      • Nominations
      • Watch the 2022 ceremony
    • Press centre
      • Go back
      • Overview
      • Patent Index and statistics
      • Search in press centre
      • Background information
        • Go back
        • Overview
        • European Patent Office
        • Q&A on patents related to coronavirus
        • Q&A on plant patents
      • Copyright
      • Press contacts
      • Call back form
      • Email alert service
  • Service & support
    • Go back
    • Forms
    • Subscription centre
      • Go back
      • Overview
      • Subscribe
      • Change preferences
      • Unsubscribe
  • Patent Index 2020
Chapter III – Examination of formal requirements
  1. Home
  2. Legal texts
  3. Guidelines for Examination
  4. Table of Contents
  5. Part A
  6. Chapter III
  7. 5. Designation of inventor
  8. 5.4 Deficiencies
Print
Facebook Twitter Linkedin Email

5. Designation of inventor

Overview

5.4 Deficiencies 

Where a designation is not filed, or where the designation filed is deficient (e.g. inventor's name or country or place of residence or the signature of the applicant is missing) so that it cannot be considered as validly filed, the applicant is informed that the European patent application will be refused if the deficiency is not remedied within the period prescribed under Rule 60(1), which is within 16 months of the date of filing or, if priority is claimed, of the date of priority. This time limit is deemed to have been met if the information is communicated before completion of the technical preparations for publication (see A‑VI, 1.2). Where the applicant has requested early publication and, accordingly, technical preparations for publication are completed before expiry of the 16-month time limit, the applicant can still file the designation within the said time limit (see J 1/10). If the deficiencies are not rectified in due time, the application is refused and the applicant is notified accordingly (as regards divisional applications, see A‑IV, 1.5). Further processing is possible according to Art. 121 and Rule 135 (see E‑VIII, 2).

Art. 90(3) to Art. 90(5)
Art. 93(1)
Rule 60(1)
Art. 121

Previous
Next
Footer - Service & support
Footer - More links
Footer
  • Terms of use
  • Legal notice
  • Data protection and privacy